How to hot melt ppr tube

Update:31 Oct 2019
Summary:

Cutting First look at the direction of your pipe, there […]

Cutting

First look at the direction of your pipe, there is the water supply and return pipe, and look at the diameter of the pipe is generally six inches and one inch of the tube, then look at how much heating is 60 or 50 is the height After confirming, it should be prepared, right angle elbow, pipe hoop, etc.

installation

Remove the old radiator, place the new radiator in the place to be installed, measure the distance of the hook with a tape measure, fix the hook with the impact drill and big eyes, put the heater on the top, level with the level, after all the above Connecting pipe fittings

Mainly the introduction of PPR fuser for hot melt machine PPR fuser, also known as heat sealer, heat sealer, etc. Suitable for heating butt PPR tubes. Simple and practical, the small price is around 30RMB. There are two kinds of adjustable temperature control and fixed temperature control. The specifications are the same as the pipe specifications. The temperature control melter can be used for other material tubing. Such as: PE PP, etc.

1. Install the heating end of the fixed fusion splicer, place the fusion splicer on the frame, install the corresponding heating dies according to the required pipe specifications, and tighten with the hex, usually small at the front end.

2. Power on

Turn on the power (note that the power supply must have a grounding protection line), the green indicator light is on, and the red indicator light is off, indicating that the fusion splicer is in automatic control state and can start operation. Attention|: In the automatic temperature control state, the red light green light will alternately light itself, which means that the fusion splicer is in a controlled state and does not affect the operation.

3. Welding pipe

The pipe is cut vertically by the pipe cutter, and the pipe and the pipe are not rotated in the die of the fusion splicer at the same time, and the operation is performed according to the requirements of the following table. Immediately after the heating time, the pipe and the pipe are removed from the die at the same time, and there is no rotation at all. The ground is evenly inserted into the desired depth to form a uniform flange at the joint.